What You Need To Know About SDG&E Rule 45 (EV Infrastructure Rule)

Posted on 1 year ago
No Comments
Blogs

With the increasing demand in EV charging station, Murow Development Consultants (Murow) has streamlined the process involving SDG&E’s Rule 45 (same as SCE Rule 29)  As an attempt to further educate the building community in the San Diego’s “sphere of influence”, Murow’s Dry Utility Coordination team has broken down SDG&E’s Rule 45 (installation of EV chargers) below:

  • Rule 45 is SDG&E’s EV Infrastructure Rule, which provides an optional new service pathway for separate metered EV charging sites – outside those of single-family homes.
  • Rule 45 aims to facilitate the transition to zero emission transformation. California Assembly Bill 841 calls for “widespread transportation electrification” through “increased access to the use of electricity as a transportation fuel.”
  • Rule 45 is an alternative to Rule 16 and does not include a customer allowance. Instead, SDGE will design, install, own and maintain all electrical equipment and associated construction between the distribution system and meter.
  • The Customer | Applicant (Customer) will only be required to submit their application, specific plans and provide the EV chargers and switchgear.
  • The Customer will need to provide “proof of commitment” to purchase and install the EV charging equipment.
  • The Customer must commit to maintaining the EV equipment for a minimum of 5 years.
  • Additional Customer requirements:
    1. Be located outside of a single-family home.
    2. Install all behind-the-meter equipment necessary to provide EV charging service.
    3. The EV charging equipment must be separately metered.
    4. Not be participating in an approved SDG&E EV infrastructure program. (The SDGE Rule 45 is the same as SCE’s Rule 29)
    5. Pay the cost of other requirements such as environmental studies, voluntary undergrounding, etc.
      • SDGE is committed to site energization within 125 days from the date your application/request is approved.

To learn more information about our Dry Utility Coordination services and SDG&E’s Rule 45 (and SCE’s Rule 29) please contact Christopher Rad, Director of Dry Utilities at [email protected]

Previous Post
Constructability Analysis for Infrastructure Improvements – Key Components and Procedures
Next Post
The Latest CPUC Decision and It’s Impact on Mixed-Fuel Projects

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Fill out this field
Fill out this field
Please enter a valid email address.
You need to agree with the terms to proceed

From The Blog

The Importance of a Proper Bid for a Successful Reimbursement

September 24, 2024

LADWP Fair Share Program: A New Approach to Line Extensions and Cost Sharing

August 26, 2024

LADWP’s Project Powerhouse: Affordable Housing and How It Affects You

August 26, 2024

Unlocking Savings: Streamlining Development with Fee Reductions

August 13, 2024

Slope Failure Remediation: The Role of Value Engineering and Construction Management Oversight

July 18, 2024

Effortlessly Navigate Riverside County’s Complex Closeout Process

June 17, 2024

Archives

Navigation

  • Home
  • Company
  • Clients
  • Services
  • Portfolio
  • Resources
  • Careers
  • Contact

Contact Us

16800 Aston Street, Suite 200
Irvine, CA 92606

(949) 988-3270

[email protected]

Facebook
YouTube
Instagram
LinkedIn

Newsletter

Sign-up for our monthly newsletter to learn more about industry news, access to useful resources, company updates, and receive other information.

Copyright © 2022 Murow Development Consultants. All Rights Reserved.

  • Terms & Conditions
  • Privacy Policy